Luegbrücke (A13 Brenner motorway): first new bridge structure due
Between 1 Oct and 31 Dec 2027 · General period
Gries am Brenner, Tyrol, Austria
ASFINAG is replacing the 1,800 m Luegbrücke on the Brenner motorway; the first of two new bridge structures is planned to be finished at the end of 2027.
In these calendars
Source
Geplante Fertigstellung erstes Brückentragwerk Ende 2027ASFINAG · read 28 Nov 2026