Columbia River Bridge (I-5 Interstate Bridge): design-builder begins design
Between 1 May and 31 Aug 2027 · General period
Portland, Oregon and Vancouver, Washington, the USA
The Interstate Bridge Replacement Program expects to select its design-builder and begin design in mid-2027; construction follows in 2028.
In these calendars
Source
A progressive design-builder is expected to be selected and begin design mid-2027, with construction expected to begin in 2028.Interstate Bridge Replacement Program · read 28 Nov 2026